City of Colorado Springs Logo
File #: AR DP 20-00383    Version: 1 Name: Elan at Pikes Peak
Type: Planning Case Status: Passed
File created: 8/13/2020 In control: Downtown Review Board
On agenda: 9/30/2020 Final action: 9/30/2020
Title: A Form-Based Zone Development Plan with Density Bonus provisions to allow construction of a 6-story, 321 unit apartment building on 2.5 acres. The site is located on the northeast corner of N. Wahsatch Ave. and E. Pikes Peak Ave. and is zoned FBZ-T2B (Form-Based Zone - Transition Sector 2B) Presenter: Ryan Tefertiller, Planning Manager, Urban Planning Division
Attachments: 1. Elan at Pikes Peak DRB Staff Report, 2. Figure 1 - Elan Pikes Peak_Development Plan updated, 3. Figure 2 - Elan Pikes Peak_Project Statement, 4. Figure 3 - Elan Pikes Peak Zoning Map, 5. Figure 4 - Elan Pikes Peak Stakeholder Input

 

Title

A Form-Based Zone Development Plan with Density Bonus provisions to allow construction of a 6-story, 321 unit apartment building on 2.5 acres. The site is located on the northeast corner of N. Wahsatch Ave. and E. Pikes Peak Ave. and is zoned FBZ-T2B (Form-Based Zone - Transition Sector 2B)

 

  Presenter: 

Ryan Tefertiller, Planning Manager, Urban Planning Division

 

Recommended Action

  Proposed Motion:

Approve the Elan Pikes Peak form-based zone development plan with two additional stories through Density Bonus provisions, based upon the finding that the application complies with the Standards in Section 2 and Density Bonuses requirements in Section 3 of Form-Based Code, subject to compliance with the following conditions of approval and technical plan modifications:

Technical and Informational Modifications to the Form-Based Zone Development Plan:

1.                     Gain acceptance of the project’s drainage report and update the development plan to reflect compliance with the necessary stormwater standards.

2.                     Gain approval of the necessary utility reports including the Hydraulic Grade Line study and the Wastewater Facilities Master Report.

3.                     Revise the Traffic Impact Analysis to meet the final minor review comments from the City’s Traffic Engineers.

4.                     Add the speed line of sight to the project’s access points on the plan.

5.                     Update the development plan to reflect the current status of the alley north of the site.




The City of Colorado Springs is committed to making its websites accessible to the widest possible audience. We are constantly working to increase the accessibility and usability of our online technology. We strive to maintain conformance to Web Content Accessibility Guidelines (WCAG) 2.1 as well as U.S. Federal Government Section 508 Guidelines. The City of Colorado Springs will be evaluating this site on a regular basis and it will continue to evolve and improve over time as new technologies emerge. If you experience difficulty accessing the information contained within this webpage please contact the Office of Accessibility at 719-385-5169.