Title
A Resolution Establishing 2023 Drainage Basin Fees, Bridge Fees, Detention Pond Facility and Land Fees
Presenter:
Richard Mulledy, P.E., Stormwater Enterprise Manager
Body
Summary:
At its September 13, 2022, meeting, the City/County Drainage Board approved a recommendation for a 9.2% adjustment in drainage, bridge and detention pond facility fees for 2023. The proposed fees are set forth in the 2023 Drainage, Bridge and Pond Fees Schedule attached as Exhibit A. The adjustment is based on the annual study of drainage facility construction cost trends conducted by City staff.
Background:
City staff performed their annual study of drainage facility construction cost trends. The study evaluated data for 2021 and 2022 from the Colorado Department of Transportation Colorado Construction Index Report (CCI), Engineering News Record (ENR) Materials and Labor Indices for Denver, Denver-Boulder-Greeley Consumer Price Index (CPI), UCCS Economic Forum statistics for the local economy, and local construction cost data. The local construction cost data input was received from several local contractors, suppliers, and vendors regularly involved in the drainage construction industry.
Staff recommends a 9.2% market adjustment to the drainage, bridge, and detention pond facility fees for 2023. Detention pond land fees will remain unchanged at $98,010 per acre, equal to the 2021 Park Land Dedication Fee for community parkland. City Code 7.7.902 states the following: "Prior to January 1 of each year, the unit detention reservoir land fee is intended to be raised or lowered by the same percentage as the City of Colorado Springs' park land dedication fee."
Drainage infrastructure is vital to ensure the City's ability to protect its citizens and downstream neighbors from potential damage due to stormwater.
Previous Council Action:
On December 14, 2021, the City Council approved Resolution No. 195-21 (Exhibit C) establishing the 2022 Drainage Basin Fees, Bridg...
Click here for full text