File #: 18-0045    Version: Name:
Type: Ordinance Status: Mayor's Office
File created: 1/11/2018 In control: City Council
On agenda: 4/10/2018 Final action: 4/10/2018
Title: Ordinance No. 18-29 amending Ordinance No. 17-116 (2018 Appropriation Ordinance) for a supplemental appropriation to the General Fund in the amount of $346,506 for The Tutt and Cowpoke Stormwater Project Presenter: Richard Mulledy, P.E., Water Resources Engineering Division Manager
Attachments: 1. Exhibit A, 2. Exhibit B, 3. Exhibit C, 4. Appropriation Ordinance for Tutt Cowpoke, 5. Signed Ordinance 18-29

 

 

Title

Ordinance No. 18-29 amending Ordinance No. 17-116  (2018 Appropriation Ordinance) for a supplemental appropriation to the General Fund in the amount of $346,506 for The Tutt and Cowpoke Stormwater Project

 

  Presenter: 

  Richard Mulledy, P.E., Water Resources Engineering Division Manager

Body

  Summary:

The Water Resources Engineering Division within the Public Works Department requests approval of the attached ordinance for a supplemental appropriation in the amount of $346,506 to the Tutt Boulevard Bridge project.  The source of funds is the Tutt bridge surcharge fees held in escrow.

 

  Previous Council Action: 

On December 12, 2017, City Council approved the original 2018 budget per Ordinance No. 17-116 (2018 Appropriation Ordinance). 

 

  Background:

The attached ordinance is a supplemental appropriation to move funds currently held in escrow to the general fund for the construction of the Tutt Boulevard Bridge over Cottonwood Creek in order to construct the Tutt/Cowpoke Detention Facility (PR-2). The total project amount is estimated at $1.75 million.

 

Between 2003 and 2014, the Reel and Powerwood Annexation agreements (see Exhibit A) were approved by City Council with the stipulation that fees would be assessed and collected when property was platted to fund the construction of the Tutt Bridge over Cottonwood Creek. The location of this bridge has been identified where Tutt Boulevard will cross Cottonwood Creek and extend north from its current location at the intersection of Tutt Boulevard and Cowpoke Road as detailed in the City’s Major Thoroughfare Plan (see Exhibit B).

 

The City is committed to constructing a regional storm water facility, PR-2, per the Intergovernmental Agreement (IGA) with Pueblo County at this location beginning in the Fall of 2018. The functionality of this facility necessitates that a roadway embankment be constructed over Cottonwood Creek for the extension of Tutt Boulevard with the roadway embankment serving as a “dam” for the detention facility. A culvert will also be constructed under the embankment such that water flowing in Cottonwood Creek can be conveyed under Tutt Boulevard at all times. The embankment and culvert will impound storm water runoff to reduce discharge rates during the 100 year storm event as required by the City’s Drainage Criteria Manual and the IGA with Pueblo County (see Exhibit C).

 

The proposed roadway embankment and box culvert that will be constructed with this project meet the definition criteria of a “bridge” as described in City code 7.7.1002 since the embankment and culvert (structure) will carry the Arterial roadway (Tutt Boulevard ) over Cottonwood Creek (natural drainage way).

 

 

  Financial Implications:

This appropriations ordinance has no impact on the General Fund Unrestricted Fund Balance.

 

  Board/Commission Recommendation:

N/A

 

  Stakeholder Process:

N/A

 

  Alternatives:

N/A

 

Recommended Action

  Proposed Motion:

Move approval of the attached ordinance approving a supplemental appropriation to the general fund in the amount of $346,506.

 

Summary of Ordinance Language

An ordinance amending Ordinance No. 17-116  (2018 Appropriation Ordinance) for a supplemental appropriation to the General Fund in the amount of $346,506 for the Tutt and Cowpoke Stormwater Project

 

 




The City of Colorado Springs is committed to making its websites accessible to the widest possible audience. We are constantly working to increase the accessibility and usability of our online technology. We strive to maintain conformance to Web Content Accessibility Guidelines (WCAG) 2.1 as well as U.S. Federal Government Section 508 Guidelines. The City of Colorado Springs will be evaluating this site on a regular basis and it will continue to evolve and improve over time as new technologies emerge. If you experience difficulty accessing the information contained within this webpage please contact the Office of Accessibility at 719-385-5169.