Skip to main content
City of Colorado Springs Logo
File #: 25-470    Version: 1 Name:
Type: Informational Report Status: Agenda Ready
File created: 8/27/2025 In control: City Council Work Session
On agenda: 1/12/2026 Final action:
Title: Park System Master Plan Project: Part 1 Park System Assessment Presentation Presenter: Nick Kuhn and Jeremy Powell, Consultant with Kimley-Horn Lonna Thelen, Manager, Parks Design and Development Kim King, Interim Director, Parks, Recreation and Cultural Services Department
Attachments: 1. COS_PSMP_PSA_PPTv3_20251211
Date Ver.Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.

 

Title

Park System Master Plan Project:  Part 1 Park System Assessment Presentation

 

  Presenter: 

Nick Kuhn and Jeremy Powell, Consultant with Kimley-Horn
Lonna Thelen, Manager, Parks Design and Development
Kim King, Interim Director, Parks, Recreation and Cultural Services Department

 

Body

  Summary:

A presentation of the Park System Assessment, which completes phase one of the 2026 Park System Master Plan. The Park System Assessment is an evaluation of parks, facilities and spaces and an extensive gathering of public and staff input on community needs.

 

  Background: 

The current Park System Master Plan (PSMP) was approved by City Council in 2014 with a life of 10-15 years. In 2025, the Parks, Recreation and Cultural Services (PRCS) Department engaged Kimley-Horn and embarked on an update to the PSMP. The update is designed to guide how Colorado Springs invests in its parks, recreation, trails, open spaces, and cultural services over the next decade with the goal of identifying the right recommendations to meet both current and future needs.

The planning process for the PSMP has two major phases. The first phase is the Park System Assessment that evaluates all parks, facilities, and spaces while gathering extensive public input on community needs. The second phase is strategic planning, which sets the long-range vision and outlines clear implementation strategies. The entire process typically takes 12- to 16-months. The goal will be to create a draft master plan by April or May of 2026.  

In the City Council work session, the consultant will present the Park System Assessment. The top 10 most common themes emerging from the assessment include:

  - Reinvestment in Existing Parks and Facilities
  - Sustainable Funding
  - Effective Communications of PRCS Needs
  - Family, Cultural and Nature-Focused Programming
  - Safety and User Comfort
  - Equitable Access
  - Open Space and Developed Parks
  - Core Comfort Features
  - Trail Connections and Wayfinding
  - Multi-Generational and Culturally Diverse Recreation Needs

The assessment has produced over 600 pages of raw data covering the condition of every park in the system, the demographic make-up of the city, the input of stakeholders (focus groups and the general public), an analysis of geographic accessibility, and much more. This information has been distilled into a 30-minute presentation which has been given to the Parks, Recreation and Cultural Services Advisory Board, TOPS Working Committee and PSMP Task Force. The background data will be preserved in the appendices to the 2026 Park System Master Plan once it is completed.

To view a recorded 20-minute presentation or read the complete document, please visit the City project page at https://coloradosprings.gov/ParkSystemMasterPlan.   

  Previous Council Action:

N/A

 

  Financial Implications:

N/A

 

  City Council Appointed Board/Commission/Committee Recommendation:

N/A

 

  Stakeholder Process:

N/A

 

  Alternatives:

N/A

 

Recommended Action

  Proposed Motion:

N/A

 

Summary of Ordinance Language

N/A




The City of Colorado Springs is committed to making its websites accessible to the widest possible audience. We are constantly working to increase the accessibility and usability of our online technology. We strive to maintain conformance to Web Content Accessibility Guidelines (WCAG) 2.1 as well as U.S. Federal Government Section 508 Guidelines. The City of Colorado Springs will be evaluating this site on a regular basis, and it will continue to evolve and improve over time as new technologies emerge. Documents created by third parties may not meet all accessibility criteria. If you experience difficulty accessing the information contained within this webpage, please contact the Office of Accessibility at 719-385-5169.