Title
A Resolution Establishing 2026 Drainage Basin Fees, Bridge Fees, Detention Pond Facility and Land Fees
Presenter:
Erin Powers, P.E., Stormwater Enterprise Manager
Body
Summary:
At its October 14, 2025 meeting, the City/County Drainage Board approved a recommendation for a 2.2% adjustment in drainage, bridge and detention pond facility fees for 2026. The proposed fees are set forth in the 2026 Drainage, Bridge and Pond Fees Schedule attached as Exhibit A. The adjustments are based on the annual study of drainage facility construction cost trends conducted by City staff.
Background:
City staff performed their annual study of drainage facility construction cost trends. The study evaluated data for 2024 and 2025 from the Colorado Department of Transportation Colorado Construction Index data (CCI), Engineering News Record (ENR) Materials and Labor Indices for Denver, Denver-Aurora-Lakewood Consumer Price Index (CPI-U), UCCS Economic Forum statistics for the local economy, and local construction cost data. The local construction cost data input was received from several local contractors, suppliers, and vendors regularly involved in the drainage construction industry.
Staff recommends a 2.2% market adjustment to the drainage, bridge, and detention pond facility fees for 2026. Detention pond land fees were adjusted in July of 2025 from $98,010 per acre for community parkland to $119,790 per acre for community parkland. City Code 7.4.702 states the following: “Prior to January 1 of each year the unit drainage fee and the unit pond land fees shall be reviewed by the Drainage Board, which shall make a recommendation to the City Council as to any adjustment to the fees. In the absence of additional studies, the unit pond land fees are intended to be raised or lowered by the same percentage as the City's park land dedication fee.”
Drainage infrastructure is vital to ensure the City’s ability to protect its citizens and downstream neighbors from potential damage due to stormwater.
Previous Council Action:
On December 10th, 2024, the City Council approved Resolution No. 190-24 (Exhibit C) establishing the 2025 Drainage Basin Fees, Bridge Fees, and Detention Pond Facility and Land Fees.
Financial Implications:
Drainage fees are paid by developers and are used to reimburse other developers who construct drainage improvements. These basin fees are not utilized by the City of Colorado Springs for drainage infrastructure, maintenance, or improvements. Instead, the fees are used to help offset the costs that developers incur to build public infrastructure that is beyond their obligation. The increases to the drainage, bridge and detention pond facility fees should help preserve the financial integrity of the drainage fee program. The revenue and expenditures for drainage, bridge and detention pond facility fees are tracked in a separate fund. There is no impact to the General Fund.
City Council Appointed Board/Commission/Committee Recommendation:
On October 14, 2025, the City/County Drainage Board voted to adjust the drainage, bridge, and detention pond facility fees by 2.2% over the current fee schedule, with an increase of 22.2% over the 2025 park land fee. The staff report for the proposed market adjustment that was presented at the October 14, 2025, City/County Drainage Board Meeting is identified as Exhibit B.
Stakeholder Process:
The industry was contacted as part of the research and stakeholder process, and they provided a letter of support through the Housing and Building Association (Exhibit D).
Alternatives:
Approve a market adjustment of 2.2% to the city-wide drainage basin fees, bridge fees and detention pond facility fees for 2026 as shown on Exhibit A. Approve a different percentage adjustment to the drainage basin fees, bridge fees and pond facility and pond land fees for 2026. Disapprove a market adjustment to the City wide drainage basin fees, bridge fees, and pond facility and pond land fees for 2026, keeping the Drainage Basin Fees the same as 2025.
Recommended Action
Proposed Motion:
Move to approve the resolution establishing 2026 drainage basin fees, bridge fees and detention pond facility and land fees as shown on Exhibit A.
Summary of Ordinance Language
N/A